Home>Equipment list>Fire/emergency rescue equipment>Plugging equipment>One stalk. Calibration of Flood Control Pile Driver Model {Supply Flood Control Pneumatic Pile Driver)
细节展示放大镜特效

One stalk. Calibration of Flood Control Pile Driver Model {Supply Flood Control Pneumatic Pile Driver)

  • No:WX-KY2018
  • Quantity:

      Recommend

    One stalk. Calibration of Flood Control Pile Driver Model {Supply Flood Control Pneumatic Pile Driver)
    One stalk. Calibration of Flood Control Pile Driver Model {Supply Flood Control Pneumatic Pile Driver)

    One stalk. Calibration of Flood Control Pile Driver Model {Supply Flood Control Pneumatic Pile Driver)


    Emergency rescue at break of flood dike (figure)

    On the afternoon of June 28, a continuous rainstorm broke out in the Mongolian Autonomous Prefecture of Bortala, Xinjiang. Rainfall triggered floods. A flood control dam was destroyed in Taweng Hamur Village, Xiaoying Pan Town, Bole City, Xinjiang. The floods rushed into the village and more than 100 villagers were besieged. After the dangerous situation occurred, the Xiaoying Pan Border Police Station urgently organized border officers and soldiers, special police, militia and border guards to set up a rescue team to block the breach of the dam and help transfer goods and livestock. As of 20:00 on the same day, the dam was successfully blocked and all the trapped people were safely transferred. At present, follow-up rescue work is still in progress.


    Five Stars Jihong Brand- WX-KY201 multi-function pneumatic pile driver (pile planter) five-star Jihong brand-WX-KY201 type pneumatic pile driver (pile planter) product use method:

    When operating this machine, under the guidance of trainers, follow the following steps.

    1. Put the pile (wood pile and steel braze) on the ground that needs to be implanted.

    2. According to the diameter of the pile, choose the appropriate pile-fixing chuck, send 2-3 people to lift the YQD pneumatic pile planter on the top of the pile, then push the pile to the center with the pile-fixing chuck, and then loosen the chuck slightly, so that the pile is in a free state in the chuck.

    3. Pneumatic pile planter is connected with rubber pipe for air source. The type of high-pressure plastic pipe is 25 mm in inner diameter and 32 mm in outer diameter.

    4. Before ventilation, please check the fixed state of each part to ensure that each part is locked, in order to prevent disconnection of connection position under high pressure and injure operators.

    5. Support the pneumatic pile planter, pull the switch to the open position, and the pneumatic pile planter starts to work continuously.

    6. After the required depth of the post implantation, the switch is pulled to the key position to end the post implantation.

    7. Move the pneumatic pile planter to the upper end of the new pile and insert it. The pile is in a free state in the center with the fixed pile chuck. Pull the switch to the open position, and the pneumatic pile planter begins to implant the new pile.

    8. Five-star Jihong-WX-KY201 multi-function pneumatic pile driver (pile planter) Five-star Jihong-WX-KY201 type pneumatic pile driver (pile planter) for flood prevention and disaster relief should be switched off immediately and stopped using, and the technical service hotline of the driving company should be dialed to guide troubleshooting.

    One stalk. Calibration of Flood Control Pile Driver Model {Supply Flood Control Pneumatic Pile Driver)
    One stalk. Calibration of Flood Control Pile Driver Model {Supply Flood Control Pneumatic Pile Driver)
    One stalk. Calibration of Flood Control Pile Driver Model {Supply Flood Control Pneumatic Pile Driver)